Crane/Derrick setup made for the Blue funnel top…name not yet decided…..and looking good!
Funnel made (25mm dowel) and Blue paint drying, Humbrol, probably be dry enough for 2nd coat after tea time.
Hatches made, and cowl vents ordered. I will not be even attempting to make a dozen cowl vents, tootricky, in fact too tricky at any size. If I only had two big ones to make I might try I suppose.
Lifeboats and bridge will be last to do as they will rather set the apparent scale of the boat, and as this is a much smaller ship than the other two (tops) I need to be careful in order to make it look smaller.
The shed is wonderfully cool, and I have been in it with the door shut to keep out the heat although the paint has still been drying ridiculously fast.
Ashley.